7.2 System Power-On

Prerequisites
Procedure
Step 1 Turn on the AC switch between the SUN2000 and the power grid.
Step 2 (Optional) Remove the locking screw beside the DC switch.
Figure 7-1 Removing the locking screw beside the DC switch
Step 3 Turn on the DC switch at the bottom of the SUN2000.
Step 4 Observe the LED indicators to check the operating status of the SUN2000.
Table 7-2 Indicator description
Category
Running indicator
Issue 01 (2021-04-05)
Before turning on the AC switch between the SUN2000 and the power grid, check that the
AC voltage is within the specified range using a multimeter.
If the DC power supply is connected but the AC power supply is disconnected, the
SUN2000 will report a Grid Loss alarm. The SUN2000 can start properly only after the
power grid recovers.
Status
LED1
Steady green
Blinking green
slowly (on for 1s and
off for 1s)
Blinking green
slowly (on for 1s and
off for 1s)
Copyright © Huawei Technologies Co., Ltd.
LED2
Steady green
Off
Blinking green
slowly (on for 1s and
off for 1s)
7 Commissioning
Description
The SUN2000 is
operating in grid-tied
mode.
The DC is on and the
AC is off.
Both the DC and AC
are on, and the
SUN2000 is not
supplying power to
the power grid.
83