Erecting the Pole
1. Check whether the pole needs to be repainted. Repaint the damaged area of
the pole, and then use the crane to hoist the pole to the foundation.
15

Verifying the Installation

1. Check that the mounting kits are securely installed and all screws are tightened.
2. Check that all cables are reliably connected with correct polarity and there is no short circuit.
3. Check whether any screw holes are not installed with screws. If so, install screws at the holes.
4. Check that all idle cable holes in modules are protected with waterproof caps.
16

Power-On Commissioning

1. Check the indicators on the power module and lithium batteries. Ensure that the green indicators are blinking slowly and that the
yellow and red indicators are off.
2. If a problem is found, refer to the alarm definitions in the user manual for troubleshooting.
2. Secure the pole to the foundation.
Huawei Industrial Base, Bantian, Longgang
Shenzhen 518129 People's Republic of China
13
Huawei Technologies Co., Ltd.
e.huawei.com

Advertisement

loading

This manual is also suitable for:

Cps300-n18a1h1