Verifying the Installation

1. The SmartACBox is installed correctly and securely.
2. All cables are connected correctly and securely and bound neatly,
without exposed metal.
3. All used cable glands and cable holes at the enclosure bottom are
blocked by fireproof material.
4. Unused USB ports are locked by watertight caps.
5. Unused cable glands are plugged with caps and the glands are
tightened.
6. All switches in the enclosure are off.
7. The enclosure interior is clean, without dust, dirt, or foreign matter.
8. The paint on the enclosure exterior is intact. If paint has flaked off,
repaint that area to prevent corrosion.
8

Installing the Cover

9

Powering On the System

Put on insulation gloves before powering on the system.
1. Switch circuit breaker QF13 on the AC output side to ON.
2. Switch circuit breakers QF01 to QF12 on the AC input side to ON one by one.
3. Switch circuit breaker QF14 in the monitoring compartment to ON.
10
Commissioning the Monitoring System
10.1
Configuring the Router Network
Log in to the router management user interface (UI) and configure router network parameters.
NOTE
For details about how to set router network parameters, see the instructions of the router or the
SmartACBox 12-In 1-Out Smart AC Combiner Box User Manual.
14
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □
Yes □ No □ N/A □