ABB TLE Scalable Series Installation Manual page 52

40 to 150 kva ul s1
Table of Contents

Advertisement

52/54
"Top Cable Entry/Exit Sidecar" (TCE) and "Top Hat Fascia" (THF) assembling
C
Edge protection over the metal cut is mandatory
to protect from sharp edges !
Fig. 6.1-3 Top Cable Entry/Exit Sidecar (TCE) and Top Hat Fascia (THF) assembling
-
Remove the roof "A" of the UPS cabinet.
-
Remove side panel "C". This panel is no longer used
Remove, with appropriate tool, the two metallic windows "D" from the metal screen.
-
-
Fix the structure "E" with the appropriate screws.
-
Fix the roof "A" of the UPS cabinet.
-
Fix the top plate "F" with the appropriate screws.
K nock out appropriate holes in top plate for "Top Cable Entry/Exit Sidecar".
1 2 4 7 B
-
Fix side panel "G" with the appropriate screws.
-
Fix the structure "Top Hat Fascia - B" with the appropriate screws.
Tensilock
M5x12
Torx
M5x12
A
TLE Scalable Series 40 to 150 UL S1
Top Hat Fascia
B
Torx
M5x12
D
.
UPS Installation Guide / REV-B
Top Cable Entry/Exit Sideca
F
Torx
M5x12
E
Torx M5x12
G
Torx M5x12

Advertisement

Table of Contents
loading

Table of Contents