4.8.3 Battery cabinet connection to TLE Scalable Series 40 to 150

Note!
The installation and cabling of the Battery cabinet must be performed only by an ABB Service
Technician!
Before proceeding to "Battery cabinet" connection, follow the Safety rules concerning the Battery.
Refer to the "Safety prescriptions – Installation/ Battery" described on Chapter 1.
Make sure that the UPS is not powered and the "Battery breaker" is open (Pos. O).
Before closing the "Battery breaker" verify the correct polarity of the Battery connection.
Battery cabinet
Battery
Dimensions (W x D x H)
Type of cables connection
"Battery cabinet(s)" must be located on left side of the UPS.
The connecting cables (+/-/PE) are supplied with the Battery cabinet.
Connect the cables to UPS bus bars "+/-/PE" using M8 bolts with a torque wrench at 195 Lb-in / 22 Nm.
Note!
Check for sufficient floor loading capacity.
For further information please consult the "Installation, Operation & Maintenance Manual" of the
"Battery cabinet".
Battery
cabinet
Fig. 4.8.3-1 TLE Scalable Series 40 to 150 - Battery cabinet connection to TLE Scalable Series 40 to 150
+ Positive pole
Attention!
It is mandatory to ground the Battery cabinet to UPS!
To meet standards concerning electromagnetic compliance, the connection between the UPS and
external Battery cabinet must be done by using a shielded cable or suitable shielded (metal)
conduit!
1 Battery cabinet / 2 Battery cabinets / 3 Battery cabinets / 4 Battery cabinets
29.80 x 29.50 x 75.00 inches / 757 x 750 x 1905 mm
40.00 x 29.50 x 75.00 inches (1016 x 750 x 1905 mm)
75°C rating; size per NEC Table 310.16 and/or all applicable national and local
codes (see also Section 4.7.4).
Wiring shall comply
to local regulations !
Output cables
+
-
To UPS
bus bars
PE (GND)
- Negative pole
TLE Scalable Series 40 to 150 UL S1
J35µP -
RS232
XA
Q1
UPS Installation Guide / REV-B
+
_
PE
Q1
PE Battery cabinet ground