Download Print this page

Huawei FusionCol8000-E400 Quick Manual page 3

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E400:

Advertisement

Requirements for Maintenance Space
2.3
Unit: mm
3
Securing the FusionCol8000-E
1. Read the related user manual before installing the device.
2. Ensure that the concrete platform levelness meets the requirements before installation.
3. The device must be installed strictly according to the heating ventilation air conditioning (HVAC)
equipment construction regulations.
Concrete Platform Scenario
3.1
When marking the mounting positions for concrete platforms, ensure that the four lines form a rectangle.
When the equipment is installed indoors, it is recommended that shock pads be installed
between the air duct and the floor.
1. According to the site space and device dimensions to decide the location of concrete platforms.
And mark the four reference points of concrete platforms using an ink fountain and measuring
tape.
Unit: mm
(1) FusionCol8000-E
(2) Concrete platform
(1) Wall
(2) Electric control box
3

Advertisement

loading