4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting a module
Mount the I/O module in any desired configuration.
Page 91 SYSTEM CONFIGURATION
2.
Wiring
Perform wiring of external devices to the I/O module.
Page 104 Wiring
3.
Adding a module
Add the I/O module to a module configuration by using the engineering tool. For details, refer to the following.
GX Works3 Operating Manual
4.
Module settings
Perform various settings of the module by using the engineering tool.
Page 110 PARAMETER SETTINGS
5.
Programming
Create a program.
GX Works3 Operating Manual
4 PROCEDURES BEFORE OPERATION
4
89