Adding refrigerants in running condition
1. Press the function key for adding refrigerant.
2. After 30 minutes of operation, open the Charging Ports on low pressure side in Heat Pump.
3. Open the valve for low pressure side in the manifold gauge to recharge the remaining refrigerant.
4. After completing, close the valves in manifold gauge and eliminate the hoses from Charging Ports.
Manifold gauge
Low pressure side
Scale
Important information regulation regarding the refrigerant used
Inform user if system contains 3 kg or more of fluorinated greenhouse gases. In this case, it has to be checked
for leakage at least once every 12 months, according to regulation n°842/2006. This activity has to be covered by
CAUTION
qualified personnel only. In case situation above (3 kg or more of R-32), installer (or recognised person which has
responsability for final check) has to provide a maintenance book, with all the information recorded according to
REGULATION(EC) N° 842/2006 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 May 2006 on certain
fluorinated greenhouse gases.
For the product that uses the R-32 refrigerant, be cautious not to generate a spark by keeping the following
requirements:
CAUTION
- Do not remove the fuses with power on.
- Do not disconnect the power plug from the wall outlet with power on.
- It is recommended to locate the outlet in a high position. Place the cords so that they are not tangled.
Precautions on adding the R-32 refrigerant
In addition to the conventional charging procedure,. the following requirements shall be kept.
Make sure that contamination by other refrigerants does not occur for charging.
To minimize the amount of refrigerant, keep the hoses and lines as short as possible.
The cylinders shall be kept upright.
Make sure that the refrigeration system is earthed before charging.
Label the system after charging, if necessary.
Extreme care is required not to overcharge the system.
Before recharging, the pressure shall be checked with nitrogen blowing.
After charging, check for leakage before commissioning.
Be sure to check for leakage before leaving the work area.
High pressure side
High pressure side
Low pressure side
Charging port
45