Project structure with access levels
The project and package structure with the possible access levels is shown in the following
overview diagram:
Figure 4-140
4.11.2
Protecting projects and components
Note
Industrial Security
Observe the information on Industrial Security. These security notes provide the basis for
protecting your data against unauthorized access, espionage, manipulation and loss.
The following documentation provides general and specific security notes for your work:
SINUMERIK / SIMOTION / SINAMICS Motion Control Industrial Security
support.industry.siemens.com/cs/ww/en/view/108862708/71018232843?dl=de)
Note
Observing security for projects and components
Note the following when handling projects and components, including any linked data:
● As protection, regularly install security updates and patches for the installed operating
system
● Transfer this data only over secure transmission routes
– Use signed or encrypted e-mails to ensure integrity.
– When using data storage media (USB sticks, hard disks, etc.), ensure that they are
This applies to all CMC files, such as package and project configurations, manipulation
tasks.
SINUMERIK Integrate Create MyConfig - Diff, Expert, Topo
Operating Manual, 12/2017, A5E36537479B-AE
Systematically displaying the project structure with the associated access levels
classified as being secure. A regular virus check must be carried out for these data
storage media.
Create MyConfig - Expert
4.11 Password protection
(https://
399