ABB SACE Emax E2.2 Installation, Operation And Maintenance Instructions For The Installer And The User page 13

Low voltage air circuit-breakers
Table of Contents

Advertisement

Disposal of packing materials For disposal of the packaging materials see the chapter " 6 - Decommissioning and treatment at end of life
11 | © 2019 ABB | 1SDH001000R0002 - ECN000109166 - Rev. D
Continued from the previous page
4.
Take out the screws (See Figure 10 Fixed circuit-breaker). Take out the screws and the mounting
brackets (See Figure 11 Moving part IEC, Figure 12 Moving part UL, Figure 13 Fixed part IEC and
Figure 14 Fixed part UL).
Figure 10 Fixed circuit-breaker
Figure 13 Fixed part IEC
" on page 73.
Figure 11 Moving part IEC
Figure 14 Fixed part UL
ABB | SACE Emax 2
Figure 12 Moving part UL
Management operations | 2 - Unpacking and handling