SUN2000-(3KTL-10KTL)-M0
User Manual
Figure 5-28 Installing the cable
Step 2 Connect the signal cable to the COM port.
Figure 5-29 Securing the signal cable connector
----End
5.6.3 Connecting the Power Grid Scheduling Signal Cable
Cable Connection
The following figure shows the cable connections between the inverter and the Ripple Control
Device.
Issue 04 (2019-10-18)
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
50