Connecting The Power Grid Scheduling Signal Cable - Huawei SUN2000 Series User Manual

Hide thumbs Also See for SUN2000 Series:
Table of Contents

Advertisement

SUN2000-(3KTL-10KTL)-M0
User Manual
Figure 5-28 Installing the cable
Step 2 Connect the signal cable to the COM port.
Figure 5-29 Securing the signal cable connector
----End

5.6.3 Connecting the Power Grid Scheduling Signal Cable

Cable Connection
The following figure shows the cable connections between the inverter and the Ripple Control
Device.
Issue 04 (2019-10-18)
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents