Figure 5-25 Installing the cable
Step 2 Connect the signal cable to the COM port.
Figure 5-26 Securing the signal cable connector
----End
5.6.3 Connecting the Power Grid Scheduling Signal Cable
Cable Connection
The following figure shows the cable connections between the inverter and the Ripple Control
Device.
Issue 02 (2019-04-30)
Copyright © Huawei Technologies Co., Ltd.
SUN2000-(3KTL-10KTL)
User Manual
Page 55 of 81