Introduction
1.1
Purpose of this document
This present manual describes the SENTRON PAC3200 Power Monitoring Device.
It is intended for the use of:
● Planners
● Plant operators
● Commissioning engineers
● Service and maintenance personnel
Required basic knowledge
A general knowledge of the field of electrical engineering is required to understand this
manual.
Knowledge of the relevant safety regulations and standards is required for installing and
connecting the device.
Validity range
This manual applies to the following delivery versions of the device:
SENTRON PAC3200 for panel mounting with
● LC display
● Screw terminal
● Ring lug terminal
Those device properties valid at the time of publication of the manual are described.
SENTRON PAC3200
Manual, 02/2008, A5E01168664B-04
1
11