Lever,Tph Adjust", "Bearing; Drum", And "Bearing,Drum - Sanyo DVP-P1EX Technical Information

Digital photo printer
Hide thumbs Also See for DVP-P1EX:
Table of Contents

Advertisement

COMPL PWB,MC-5 (MC-5)
GUIDE,PAPER EXIT (6P100)
COMPL PWB,MC-4 (MC-4)
Fig. 3-16-2
3-17. "LEVER,TPH ADJUST (1D000) ",
"BEARING,DRUM (7D000) ", and
"BEARING,DRUM (7B000) "
(See Figs. 3-17-1 to 3-17-2)
1)
When removing the "BEARING,DRUM
"LEVER,TPH ADJUST
(7A000)
R
" side, refer to section 3-14 and remove the
(7A000)
"ASSY,CHASSIS R
2)
When removing the "BEARING,DRUM
"LEVER,TPH ADJUST
(7C000)
L
" side, refer to section 3-1 and remove the
"GUIDE,INK-SVF01/EX
3)
Remove the two "SCR S-TPG BIN 2.6X4
(Refer to Fig. 3-17-1 and Fig. 3-17-2.)
4)
Remove the "LEVER,TPH ADJUST
Fig. 3-17-1 and Fig. 3-17-2.)
5)
Remove the "BEARING,DRUM
3-17-2.)
6)
Remove the "BEARING,DRUM
3-17-1.)
ASSEMBLY NOTES:
1.
Align hole 1 on the "LEVER,TPH ADJUST
the dowel on the "ASSY,CHASSIS R
(7C000)
"ASSY,CHASSIS L
Fig. 3-17-2.)
2.
Align hole 2 on the "LEVER,TPH ADJUST
hole 3 on the "ASSY,CHASSIS R
(7C000)
"ASSY,CHASSIS L
Fig. 3-17-2.)
3.
Referring to Fig. A of Fig. 3-17-2, insert the Lever TPH
Adjusting Tool (VJ8-0225) perpendicularly against the
"LEVER,TPH ADJUST
aligned in step 2 above, and align position of the
"LEVER,TPH ADJUST
(7C000)
L
" side. Then tighten "SCR S-TPG BIN 2.6X4
(1E000)
". Next align position of the "LEVER,TPH AD-
(1D000)
JUST
" on the "ASSY,CHASSIS R
4.
After installing the "LEVER,TPH ADJUST
out the Lever TPH Adjusting Tool (VJ8-0225).
SCR S-TPG BIN 2.6X4
(6Q000)
SCR S-TPG BIN 2.6X4
(6Q000)
(7B000)
" or the
(1D000)
" on the "ASSY,CHASSIS
". (Refer to Fig. 3-17-1.)
(7D000)
" or the
(1D000)
" on the "ASSY,CHASSIS
(03800)
". (Refer to Fig. 3-17-2.)
(1E000)
(1D000)
". (Refer to
(7D000)
". (Refer to Fig.
(7B000)
". (Refer to Fig.
(1D000)
(7A000)
" or the
". (Refer to Fig. 3-17-1 and
(1D000)
(7A000)
" or the
". (Refer to Fig. 3-17-1 and
(1D000)
" and then into the hole
(1D000)
" on the "ASSY,CHASSIS
(7A000)
(1D000)
5.
Referring to section 3-9, align phase between the "CAM,
MECHANISM R
(5K000)
".
6.
Referring to section 3-6 and 3-7, adjust the tension of the
"BELT,MOTOR STEP
(4I000)
".
ASSY,CHASSIS
R (7A000)
Hole 2
SCR S-TPG BIN
2.6X4 (1E000)
Hole 1
LEVER,TPH ADJUST
(1D000)
Lever TPH adjusting tool
".
SCR S-TPG BIN
2.6X4 (1E000)
" with
Hole 1
" with
LEVER,TPH ADJUST
(1D000)
" side.
", pull
–25–
(5L000)
" and the "CAM,MECHANISM L
(4J000)
" and "BELT,DRUM
Hole 3
Dowel
Fig. 3-17-1
(VJ8-0225)
Hole 3
Hole 2
Fig. A
Dowel
Hole 1
Hole 3
Hole 2
BEARING,DRUM
(7D000)
ASSY,CHASSIS L (7C000)
Fig. 3-17-2
BEARING,
DRUM
(7B000)
Dowel

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dvp-p1cDvp-p1

Table of Contents