Checking The Work Carried Out - Siemens SIMOTICS-T 1FW68 Engineering Manual

Segment motors, radial for sinamics s120
Table of Contents

Advertisement

Configuring
5.2 Mounting
5. Tighten the screws of the two outer T-sliding blocks.
6. Proceed in a similar way for all of the other stator segments to be mounted.
5.2.5

Checking the work carried out

Checking the mounting work
Before moving the rotor, remove all tools and objects from the swivel range and air gap.
After mounting has been completed, check that the rotor can freely rotate.
Risk of electric shock
A voltage is induced in the stator when the rotor is rotated. There is risk of an electric shock
if you touch the terminals, the open cable ends or the connector.
• Correctly connect the motor power cables.
110
WARNING
Alternatively:
Insulate the connectors or terminals and conductors of open cable ends before you
rotate the rotor.
1FW68 radial segment motors
Configuration Manual, 04/2017, 6SN1197-0AE02-0BP1

Advertisement

Table of Contents
loading

Table of Contents