CONTENTS
1
INTRODUCTION ......................................................... 1
2
SETTING UP ............................................................... 2
2.1
2.1.1
2.2
2.3
3
3.1
3.2
4
4.1
5
5.1
Operating Page Introduction .......................... 12
5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.2
Operating Page Displays ............................... 13
5.3
5.3.1
5.3.2
5.3.3
5.4
Totals Page Displays ...................................... 17
5.5
5.5.1
5.6
5.7
5.7.1
5.8
5.9
5.9.1
5.10
5.10.3 Calculating the Transition
6
6.1
Operating Page Displays ............................... 35
6.2
6.2.1
6.2.2
6.2.3
6.3
Totals Page Displays ...................................... 37
7
8
SPARES LIST ........................................................... 39
1 INTRODUCTION
Page
The COMMANDER 1900 series of documentation is shown in
Fig. 1.1. The
Standard Manuals
sheet, are supplied with all instruments. The
supplied depend on the specification of the
Manuals
instrument.
INSTALLATION
Product Identification
Siting
Mounting
Electrical Connections
Installation Record
IM/C1900-INS
PROGRAMMING
Basic Config. Level
Control Config. Level
Advanced Config. Level
IM/C1900-PGC
ADVANCED SOFTWARE
OPTIONS
Flow Totalisation
Ramp/Soak Profile
Maths Functions
Timer Functions
IM/C1900-ADV
B - Supplementary Manuals
Fig. 1.1 COMMANDER 1900 Documentation
, including the specification
OPERATION
Setting Up
Error Messages
Displays & Controls
Operating Level
Simple Fault Finding
Part No.
IM/C1900-OGC
SPECIFICATION SHT.
Full Specification
Part No.
SS C1900
A - Standard Manuals
Modbus (RTU)
Serial Adaptors
Serial Connections
Programming Pages
ASCII Tables
Part No.
IM/C1900-MOD
Supplementary
Part No.
Part No.
Part No.
1