Checks Upon Arrival And Unpacking; Check Upon Arrival; Check Upon Unpacking; Installation Instructions For Main Terminal Box And Cooler Parts - ABB AMA Series Manual

For induction motors and generators
Table of Contents

Advertisement

Manual for Induction Motors and Generators

2.4 Checks upon arrival and unpacking

2.4.1 Check upon arrival

2.4.2 Check upon unpacking

2.5 Installation instructions for main terminal box and cooler parts

2.5.1 Installation of main terminal box

12 - Transport and Unpacking
The machine and the package must be inspected immediately upon arrival. Any transport
damage must be photographed and reported immediately, i.e. within less than one (1) week after
arrival, if the transport insurance is to be claimed. It is, therefore, important that evidence of
careless handling is checked and reported immediately to the transport company and the
supplier. Use checklists in Appendix COMMISSIONING REPORT.
A machine, which is not to be installed immediately upon arrival, must not be left without
supervision or without protective precautions. For more details, see Chapter 2.6 Storage.
Place the machine so that it does not hinder the handling of any other goods and on a flat,
vibration-free surface.
After the package has been removed, check that the machine is not damaged and that all
accessories are included. Tick off the accessories on the packing list which is enclosed. If there
is any suspected damage or if accessories are missing, take photographs thereof and report this
immediately to the supplier. Use checklists in Appendix COMMISSIONING REPORT.
For correct recycling and disposal of the packaging material, see Chapter 10.3 Recycling of
packaging material.
These instructions are applied, when the machine is delivered on site with disassembled main
components, such as the main terminal box or cooler parts. Refer to the Dimension Drawing
included in the project documentation for the correct positions of the parts. All bolts, nuts and
washers are included in the delivery.
Mechanical assembly should be done only by experienced personnel. Electrically active parts
such as stator cables should be installed by skilled persons only.
Safety instructions must be observed at all times, for more information see Safety Instructions at
the beginning of the manual.
To ensure that the warranty terms agreed in the purchase order contract of the project are not
invalidated, these instructions should be followed carefully.
The main terminal box is delivered with the machine in a separate box/slide package. The
installation of the main terminal box is performed according to these guidelines.
1.
Open the package and lift the main terminal box with a suitable lifting device (for example
a crane) from the lifting eyes of the main terminal box.
2.
Check that all connection parts are free of dust and dirt.
3.
Prepare the delivered bolts and washers for installation.
3BFP 000 050 R0101 REV E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents