ABB ACS580-01 Installation Manual page 12

Uk gland plate +h358
Hide thumbs Also See for ACS580-01:
Table of Contents

Advertisement

8 Installation with option +H358 UK gland plate
2. Prepare to make holes in the UK gland plate for the SWA glands of the cables to
be installed. Lay out the glands onto the gland plate so that the earthing rings
have space. Drill the needed holes. This drawing shows an example. The number
and layout of the holes varies in different frames.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs880-01Ach580-01Acq580-01

Table of Contents