Removal And Reinstallation Of The Front - Mitsubishi Electric A800 Plus Instruction Manual

Separated converter type, roll to roll function
Hide thumbs Also See for A800 Plus:
Table of Contents

Advertisement

Removal and reinstallation of the front cover
2.2
Removal and reinstallation of the front cover
Removal and reinstallation of the operation panel
• Loosen the two screws on the operation panel.
(These screws cannot be removed.)
To reinstall the operation panel, align its connector on the back with the PU connector of the inverter, and insert the operation
panel. After confirming that the operation panel is fit securely, tighten the screws. (Tightening torque: 0.40 to 0.45 N·m)
Removal of the terminal block cover
(a)
(a)
Remove the mounting screws to remove the terminal block cover. (The number of the mounting screws differs by the capacity.)
(b)
With the terminal block cover removed, the main circuit terminals can be wired.
18
INSTALLATION AND WIRING
• Press the upper edge of the operation panel while pulling
out the operation panel.
(b)

Advertisement

Table of Contents
loading

Table of Contents