Download Print this page
ABB Navigator 550 Spares Replacement Procedures
ABB Navigator 550 Spares Replacement Procedures

ABB Navigator 550 Spares Replacement Procedures

Hydrazine wet-section
Hide thumbs Also See for Navigator 550:

Advertisement

Quick Links

Information INF13/114–EN
Navigator 550
Hydrazine wet-section
Spares replacement procedures
1 Safety
Warning.
These procedures must be carried out by a trained technician.
CHEMICAL
Ensure personal protective equipment (PPE) such as
and
gloves
eye protection
maintenance.
Observe all health and safety procedures for handling
chemicals.
To familiarize yourself with handling precautions, dangers
and emergency procedures, always review the Material
Safety Data Sheets prior to handling containers,
reservoirs and delivery systems that contain chemical
reagents and standards.
Take care if cleaning any spillages and observe all relevant
safety instructions. Wipe up any spillages using clean
water.
Perform general cleaning of the wet-section using a damp
cloth only – mild detergent can be used as a cleaning aid.
Do not use Acetone or any organic solvents.
ELECTRICAL
Isolate all high voltage supplies to the transmitter before
performing replacement procedures.
The wet-section is vulnerable to electrostatic damage.
Wear an anti-static strap or dismantle the wet-section on
an anti-static workbench.
Ensure all electrical connections are kept dry at all times.
GENERAL
Shut off the external sample supply to the wet-section
before performing replacement procedures. When a
procedure is complete, restore power to the transmitter,
sample to the wet-section at the correct flow rate and, if
necessary, calibrate the wet-section – refer to the
wet-section Operating Instructions (OI/AHM550-EN) for
calibration instructions.
Dispose of the old components in accordance with the
guidelines contained in the Operating instructions
(OI/AHM550-EN).
are worn during any
2 Tools required
Pozidrive screwdriver
Slot-head terminal screwdriver
Anti-static strap.
3 Replacement procedures
Modbus cable assembly –
see Section 3.1, page 2
Fig. 3.1 Low level dissolved oxygen wet-section – replacement procedures
PCB housing seals,
PCB cover and PCB –
see Section 3.1, page 2
Constant-head
assembly, pressure
switch assembly and
pressure switch cable –
see Section 3.4, page 3
Solenoid valve assembly
and solenoid valve cable –
see Section 3.4, page 3
Flowmeter assembly
and flowmeter cable –
see Section 3.2, page 2

Advertisement

loading

Summary of Contents for ABB Navigator 550

  • Page 1 Information INF13/114–EN Navigator 550 Hydrazine wet-section Spares replacement procedures 1 Safety 2 Tools required  Pozidrive screwdriver Warning.  Slot-head terminal screwdriver  These procedures must be carried out by a trained technician. Anti-static strap. 3 Replacement procedures CHEMICAL ...
  • Page 2 1 3 5 7 9 1 1 13 15 17 19 21 23 25 27 29 31 33 3 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 Fig. 3.3 Wet section PCB cable entries INF13/114–EN | Navigator 550 | Hydrazine wet-section | Spares replacement procedures...
  • Page 3 IN/OUT Fig. 3.6 Replacing the solenoid valve assembly and solenoid valve cable Fig. 3.5 Replacing the constant-head assembly, pressure switch assembly and pressure switch cable Navigator 550 | Hydrazine wet-section| Spares replacement procedures | INF13/114–EN...
  • Page 4 We reserve all rights in this document and in the subject matter and illustrations contained therein. Any reproduction, disclosure to third parties or utilization of its contents in whole or in parts – is forbidden without prior written consent of ABB. Copyright© 2013 ABB All rights reserved Fig.