6.2 Powering On the System

Prerequisites
Before turning on the AC switch between the SUN2000 and the power grid, check that the AC
voltage on the power grid side of the AC switch is within the specified range.
If the DC is on and the AC is off, the SUN2000 reports a Grid Failure alarm. The SUN2000
starts normally only after the fault is rectified.
Procedure
Step 1
Turn on the AC switch between the SUN2000 and the power grid.
Step 2 Turn on the DC switch between the PV string and the SUN2000 if there is any.
Step 3 Turn on the DC switch at the bottom of the SUN2000.
Step 4 Perform quick settings on the FusionHome app.
Step 5 (Optional) Measure the temperatures at the joints between the DC terminals and the
connectors using a point-test thermometer.
Step 6 Observe the LEDs to check the SUN2000 operating status.
Table 6-2 LED description
Type
Running
indication
Issue 01 (2018-08-30)
Under normal operation conditions of the SUN2000, the temperature rise at DC terminals should remain
below 30° C at all time.
Status
LED 1
Steady green
Blinking green
at long intervals
(on for 1s and
then off for 1s)
Off
Blinking green
at long intervals
(on for 1s and
then off for 1s)
Copyright © Huawei Technologies Co., Ltd.
Meaning
N/A
LED 2
Steady green
The SUN2000 is exporting
power to the power grid.
The DC is on and the AC is
Off
off.
Blinking green at
The DC is off and the AC is
long intervals (on
on.
for 1s and then
off for 1s)
Blinking green at
Both the DC and AC are on,
long intervals (on
and the SUN2000 is not
for 1s and then
exporting power to the power
off for 1s)
grid.
6 System Commissioning