Chapter 4 Procedures Before Operation - Mitsubishi Electric MELSEC iQ-R Series User Manual

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Network construction
Configure the system and set the parameters which are required for start-up.
• Wiring ( Page 61 WIRING)
• Parameter setting ( User's Manual (Application) for each network)
2.
Network diagnostics
Using network diagnostics, check if the cables are connected properly and communication is performed normally with the
configured parameters.
For details, refer to the following.
 User's Manual (Application) for each network
3.
Programming
Create a program. For details, refer to the following.
Page 69 COMMUNICATION EXAMPLES
4 PROCEDURES BEFORE OPERATION
44