Installing Components; Installing An Smu - Huawei ETP4830-A1 User Manual

Hide thumbs Also See for ETP4830-A1:
Table of Contents

Advertisement

ETP4830-A1
User Manual
Figure 4-2 Installing a subrack
----End

4.2 Installing Components

4.2.1 Installing an SMU

Procedure
Step 1 Insert a new SMU into the slot, push the locking latch towards the left, and pull out the
handle.
Step 2 Slide the SMU into the subrack along the guide rail, and push the locking latch to the right to
secure the handle.
Figure 4-3 Installing an SMU
----End
Issue 06 (2014-02-20)
The ETP4830-A1 can be installed in a European Telecommunications Standards Institute (ETSI) rack if
the required mounting ears are available.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installation
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents