Power Distribution Unit Installation (For Regions Other Than The Emeia, Central American, And Caribbean Regions) - Fujitsu ETERNUS AF250 S2 Configuration Manual

All-flash arrays storage
Hide thumbs Also See for ETERNUS AF250 S2:
Table of Contents

Advertisement

Chapter 2
Rack Installation
2.1

Power Distribution Unit Installation (for Regions other than the EMEIA, Central American, and Caribbean Regions)

If the storage system is installed at the bottom of a rack, a space for the surplus of cables may not be
available in some racks, preventing the storage system from being pulled out when maintenance work
is required. In this case, secure a space of 1U or more at the bottom when installing the storage system.
To install an enclosure, power distribution units, power synchronized units, and UPS units in a single
rack, mount the devices in the following order (from bottom to top).
4
3
2
1
Installation
order
2.1
Power Distribution Unit Installation (for Regions other than
the EMEIA, Central American, and Caribbean Regions)
This section describes how to install the power distribution unit in a rack.
Rack
Drive enclosure
Controller enclosure
Power distribution unit/
Power synchronized unit
UPS
Do Not
Do not connect any devices other than the ETERNUS AF to the power distribution
unit.
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays Configuration Guide (Basic)
Copyright 2017 FUJITSU LIMITED
23
P3AG-1832-04ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus af250

Table of Contents