Optional Discharge Ionization Detector; Scheduled Maintenance; Removing The Detector; Installing The Detector - ABB PGC5000 Series Service Instructions Manual

Process gas chromatographs
Hide thumbs Also See for PGC5000 Series:
Table of Contents

Advertisement

PGC5000
PGC5000 Series Service Instructions

7.9 Optional discharge ionization detector

Replacing the reactor tube while it is in the oven is not advised. Due to the small pieces and awkward angles involved in the
procedure, it is highly recommended the Discharge Ionization Detector (DID) be removed before attempting replacement.
The detector is located in the oven as shown in Figure 7.19. Its Power Supply is located inside the oven's left side door (see
Figure 7.20).
Figure 7.19. Discharge Ionization Detector
Power Supply
Figure 7.20. DID Power Supply

7.9.1 Scheduled maintenance

There are no parts within the detector, the power supply, or the electrometer that require scheduled maintenance.

7.9.2 Removing the detector

1.
Disable the isothermal oven temperature zone.
2.
Allow the oven to cool to room temperature.
3.
Turn off power to the oven.
4
Turn off the plasma power supply switch (located on the top of the supply).
5.
Wait at 30 seconds for the plasma to discharge.
6.
Grasp the high voltage shield and remove the plasma high voltage lead from the plasma cell by pulling on the bayonet
connector.
7.
Loosen the inside closest nut to the detector body.
8.
Loosen the 1/4-inch tube nut at the other end of the plasma cell.
9.
Remove the plasma cell, being careful not to damage the center electrode ceramic.
10. Remove the Phillips head screw that secures the two halves of the high voltage shield and retain the screw.
11. Remove the high voltage shield.

7.9.3 Installing the detector

1.
Install the high voltage shield on the replacement plasma cell.
SI/PGC5000-EN, Rev B
DID Location
7 Subassembly repair
73