2-1. Installation Tasks

Installation tasks should be completed in the following order:
1. Unpack equipment
2. Install the CCP-8000 main panel, the Menu Panel (MKS-8011) and the AUX panel (separate unit
only) and System Control Unit (MKS-8010).
3. Install the switcher processor, DME processor, and DCU.
4. Connect cables and configure internal system communications (including Ethernet and IP address.)
5. Connect cables to video inputs and outputs, DME V/K.
6. Connect the power cables.
7. Test that the power supply system works correctly and communications are established correctly in
the system.
8. Test basic system for proper operation
9. Cable external interface (including Tally and GPI).
10. Configure external interface.
11. Test external interfaces for proper operation
MVS-8000 System
SYSTEM SETUP
Section 2

Installation

2-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mve-8000Mvs-8300Dcu-8000Mvs-8400Mvs-8000Mvs-8200

Table of Contents