Hardware Installation - NEC 2400 Integration Manual

Intuity integration with nec neax 2400 switch
Table of Contents

Advertisement

Hardware Installation

This chapter describes the hardware and cable installation tasks required to
integrate the NEAX 2400 MCI switch with an INTUITY System through a switch
integration device (SID). Before you proceed with the instructions in this chapter,
verify that the hardware has been installed and that all required steps have been
completed on one of the following checklists:
INTUITY MAP/5 Installation Checklist, 585-310-147
INTUITY MAP/40 Installation Checklist, 585-310-141
INTUITY MAP/100 Installation Checklist, 585-310-137
This chapter covers the installation of all integration-related hardware
components. The tasks must be performed by the AT&T installation technician,
the customer, or the customer's switch technician. Each task provides an
explanation of who should perform the task.
The hardware installation tasks covered in this chapter include:
Connect an analog line to the modem
Connect the MCI line to the switch
Connect the MCI cable to the A25B cable
Connect the Null cable and the Y-cable to the SID
Connect the SID to the INTUITY system
Connect the SID power cord
Continue with the instructions on the next page to install the hardware.
4
Issue 2 December 1995
4-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neax 2400

Table of Contents