NEC SMB8000 Manual

Etia, poe
Hide thumbs Also See for SMB8000:
Table of Contents

Advertisement

SMB8000
ETIA - G
P
E S
M
IGABIT
O
WITCH
ANUAL
Issue 3.0 - May 2010

Advertisement

Table of Contents
loading

Summary of Contents for NEC SMB8000

  • Page 1 SMB8000 ETIA - G IGABIT WITCH ANUAL Issue 3.0 - May 2010...
  • Page 3 Contents of this manual are subject to change without prior notice at the discretion of NEC Unified Solutions. This document has been prepared for the use of employees and customers of NEC Unified Solutions and may not be reproduced without prior written approval of NEC Unified Solutions.
  • Page 5: Table Of Contents

    Table of Contents ___________________________________________________________________________________ Chapter 1 Regulatory Chapter 2 CD-ETIA Blade Section 1 Description ................... 2-1 Section 2 Stacking ..................2-2 Section 3 Indicators, Switches and Connectors ........2-4 LED Indicators ..................2-4 Connectors ..................... 2-5 Switches ....................2-5 Power and Thermal Considerations ............2-5 Environmental Considerations ..............
  • Page 6 Issue 3.0 SMB8000 ___________________________________________________________________________________ Section 2 Configuring the PC ..............4-1 Chapter 5 Gigabit PoE Switch Web Manager Section 1 Logging in to Gigabit PoE Switch (CD-ETIA Blade) ....5-1 Section 2 Home Menu .................. 5-2 Section 3 Port Link Status ................5-4 Section 4 Port Configuration ...............
  • Page 7 List of Figures and Tables ___________________________________________________________________________________ Figure 2-1 CD-ETIA Blade ......................2-4 Table 2-1 CD-ETIA Blade Switch Settings ................2-5 Figure 3-1 Inserting Blades in the 19” CHS2U-US Chassis ............3-2 Table 4-1 Network Settings for TCP/IP Addressing ..............4-1 Figure 4-1 Selecting Control Panel ...................
  • Page 8 Issue 3.0 SMB8000 ___________________________________________________________________________________ Figure 5-16 Configuration Download/Upload Screen ............... 5-21 Figure 5-17 Save Configuration File to Specific Location ............5-22 Figure 5-18 Select File for Configuration Download ..............5-23 Figure 5-19 System Busy Message ..................5-23 ___________________________________________________________________________________ List of Figures and Tables...
  • Page 9 Regulatory Chapter 1 For regulatory information please refer to the Regulatory Information manual. ___________________________________________________________________________________ Gigabit PoE Switch Manual 1 - 1...
  • Page 10 Issue 3.0 SMB8000 ___________________________________________________________________________________ -- NOTES -- ___________________________________________________________________________________ 1 - 2 Regulatory...
  • Page 11: Chapter 2 Cd-Etia Blade

    CD-ETIA Blade Chapter 2 ECTION ESCRIPTION The CD-ETIA blade is a managed 8-port Gigabit PoE Switch. The Gigabit PoE Switch provides offices that require high network performance to exchange large data files and images and access real-time information or connect to high-speed servers or a high-speed network backbone.
  • Page 12: Stacking

    Issue 3.0 SMB8000 ___________________________________________________________________________________ Provides Web Base Utility for remote management and upgrades GUI supports multiple blade configuration ECTION TACKING (This feature is only supported in the SV8100 Chassis) The idea of stacking allows the user the ability to manage multiple ETIA cards in one system as one switch, instead of individual units and IP addresses, etc.
  • Page 13 SMB8000 Issue 3.0 ___________________________________________________________________________________ The Main board receiving this broadcast message will acknowledge by sending port identification information to the Add-on board and a board type (i.e. Add-on 1, Add-on 2, etc.). The board type will identify the Add-on board to system (Main ETIA) of its port assignments.
  • Page 14: Indicators, Switches And Connectors

    Issue 3.0 SMB8000 ___________________________________________________________________________________ ECTION NDICATORS WITCHES AND ONNECTORS Refer to Figure 2-1 CD-ETIA Blade for LED and switch locations. RJ45 Connector (x8) Activity LED (x8) Figure 2-1 CD-ETIA Blade LED Indicators The LEDs for each port indicate of the status of an activity.
  • Page 15: Connectors

    SMB8000 Issue 3.0 ___________________________________________________________________________________ Connectors The following connectors are used: J1 (Backplane Connector) This connector is used to connect to the PBX chassis. J5 (Ethernet Ports) There are eight ports for 10/100/1000 Mbps Ethernet connectivity. Ports are auto-sensing for speed, duplexing, polarity and MDI-X.
  • Page 16 Issue 3.0 SMB8000 ___________________________________________________________________________________ -- NOTES -- ___________________________________________________________________________________ 2 - 6 CD-ETIA Blade...
  • Page 17: Cd-Etia Blade Setup

    CD-ETIA Blade Setup Chapter 3 CD-ETIA B ECTION NSTALLING THE LADE System Requirements This blade can be installed in any universal slot in the controlling chassis (slots 2~6) and expansion chassis (slots 7~24). The maximum number of CD-ETIA blades that can be installed in one chassis is limited by system power.
  • Page 18: Installing The Cd-Etia Blade In The Chassis

    Issue 3.0 SMB8000 ___________________________________________________________________________________ Installing the CD-ETIA Blade in the Chassis To install this blade with the system running: Insert the blade within the guide rail and push the blade securely into position. Tighten the thumb screws on either side of the blade.
  • Page 19 SMB8000 Issue 3.0 ___________________________________________________________________________________ User Password Level Programs at this Level Name 0000 ADMIN1 System Administrator – Level 1 (SA): (SA) 10-01, 10-02, 10-12, 10-13, 10-14, 10-15, 10-16, 10-17, 10-18, 10-22, 12-02, 12-03, 12-04, 15-01, 15-07, 15-09, 15-10, 15-11, 20-16, 21-07, 21-14,...
  • Page 20 Issue 3.0 SMB8000 ___________________________________________________________________________________ -- NOTES -- ___________________________________________________________________________________ 3 - 4 CD-ETIA Blade Setup...
  • Page 21: Configuring The Pc

    CD-ETIA Blade Configuration Chapter 4 CD-ETIA B ECTION ONFIGURING THE LADE When installed for the first time, the CD-ETIA blade comes up with the factory default parameters shown in Table 4-1 Network Settings for TCP/IP Addressing. Table 4-1 Network Settings for TCP/IP Addressing IP Address 192.168.1.110 Subnet Mask...
  • Page 22: Figure 4-1 Selecting Control Panel

    Issue 3.0 SMB8000 ___________________________________________________________________________________ To configure the PC: Press Start and select Control Panel from the menu. Windows XP Professional operating system is used in this example. When using a different Windows operating system, the screens may look slightly different.
  • Page 23: Figure 4-2 Control Panel Screen

    SMB8000 Issue 3.0 ___________________________________________________________________________________ On the Control Panel menu, double click on Network Connections Figure 4-2 Control Panel Screen ___________________________________________________________________________________ Gigabit PoE Switch Manual 4 - 3...
  • Page 24: Figure 4-3 Network Connections Screen

    Issue 3.0 SMB8000 ___________________________________________________________________________________ From the Network Connections screen, double click on Local Area Connection. Figure 4-3 Network Connections Screen When the Local Area Connection Status screen is displayed, click the Properties button. Figure 4-4 Local Area Connection Status Screen...
  • Page 25: Figure 4-5 Local Area Connection Properties Screen

    SMB8000 Issue 3.0 ___________________________________________________________________________________ From the Local Area Connection Properties screen, select Internet Protocol (TCP/IP) and then Properties. Figure 4-5 Local Area Connection Properties Screen ___________________________________________________________________________________ Gigabit PoE Switch Manual 4 - 5...
  • Page 26: Figure 4-6 Internet Protocol (Tcp/Ip) Properties Screen

    Issue 3.0 SMB8000 ___________________________________________________________________________________ Click on Use the following IP address. For this example, enter 192.168.1.99 for the IP address and 255.255.255.0 for the Subnet mask. Click OK to accept the changes. Figure 4-6 Internet Protocol (TCP/IP) Properties Screen On the Local Area Connection Status screen, click Close, then close the...
  • Page 27: Gigabit Poe Switch Web Manager

    Gigabit PoE Switch Web Manager Chapter 5 (CD-ETIA B ECTION OGGING IN TO IGABIT WITCH LADE The CD-ETIA blade is configured using an Internet Browser. Microsoft Internet Explorer 6.0 or higher is recommended. The Login screen allows a user to enter their user name (admin) and password (password) for web management access.
  • Page 28: Section 2 Home Menu

    Issue 3.0 SMB8000 ___________________________________________________________________________________ After entering the username and password, click on Login to access the CD-ETIA blade. ECTION After a technician logs into the CD-ETIA blade web-interface, the Home page or Main Menu is displayed. This menu provides access to the configurable settings and administrative functions available for the CD-ETIA blade.
  • Page 29 SMB8000 Issue 3.0 ___________________________________________________________________________________ Port Mirroring (refer to Figure 5-8 Port Mirroring Configuration Screen on page 5-12) Port PVID (refer to Figure 5-9 Port PVID (1~8) Screen on page 5-13) VLAN Settings (refer to Figure 5-11 VLAN Configuration Screen on page 5-15) Administration –...
  • Page 30: Section 3 Port Link Status

    Issue 3.0 SMB8000 ___________________________________________________________________________________ ECTION TATUS This screen shows the connection status for each Ethernet port. This page refreshes automatically every 10 seconds to update the current link status. Click Home to return to the Home Menu. Figure 5-3 Port Link Status (1~8) Screen...
  • Page 31: Figure 5-4 Port Link Status (9~16) Screen

    SMB8000 Issue 3.0 ___________________________________________________________________________________ Figure 5-4 Port Link Status (9~16) Screen Port – A real time image is displayed for those connected devices. Port LED colors are shown in Green or Red and Gray for those items not connected. Link Status – Active status indication is shown when there are Ethernet devices connected.
  • Page 32: Port Configuration

    Issue 3.0 SMB8000 ___________________________________________________________________________________ ECTION ONFIGURATION The port configuration page displays the settings for each of the Switches ports. Port – The number of the port. Admin State – The port can be taken offline by selecting the disable option. When enabled the port can be accessed as normal.
  • Page 33: Figure 5-5 Port Configuration Screen

    SMB8000 Issue 3.0 ___________________________________________________________________________________ Click Home to return to the Home Menu. Figure 5-5 Port Configuration Screen ECTION ETTINGS Precautions should be considered when provisioning PoE, as it is possible to oversubscribe the available PoE power. When the switch provides power for all existing Powered Devices (PDs), it does not use its power priority settings to allocate power.
  • Page 34: Table 5-1 Maximum Power – Blades

    Issue 3.0 SMB8000 ___________________________________________________________________________________ Once a PD connects to a port and begins operating, the system power budget availability is reduced by the maximum limit of the PD’s power classification. Thus, if there is less than 15.4 watts available, the priority methods described above are used.
  • Page 35: Table 5-2 Ieee802.Af Class Specifications

    An IP DECT Access Point (DAP - AP200S) acts a Class 3 device taking 15,000mW from the total available when plugged in. For additional information on the amount of power consumed by NEC terminals, reference the SV8100/SV8300 System Hardware Manual. ___________________________________________________________________________________...
  • Page 36: Poe Settings

    Issue 3.0 SMB8000 ___________________________________________________________________________________ Click Apply to accept the changes. Click Refresh if your web page cannot be displayed or to ensure the latest version of the page is displayed. Click Home to return to the Home Menu. Figure 5-6 PoE Settings (1~8) Screen...
  • Page 37: Figure 5-7 Poe Settings (9~16) Screen

    SMB8000 Issue 3.0 ___________________________________________________________________________________ Figure 5-7 PoE Settings (9~16) Screen ___________________________________________________________________________________ Gigabit PoE Switch Manual 5 - 11...
  • Page 38: Port Mirroring Configuration

    Issue 3.0 SMB8000 ___________________________________________________________________________________ ECTION IRRORING ONFIGURATION This screen allows users to monitor entry/exit traffic using a single port (designated as a Mirror Port). Port mirroring monitors and mirrors network traffic by forwarding incoming and outgoing packets from one port to another port. Port Mirroring can be used as a debugging tool.
  • Page 39: Section 7 Port Pvid

    SMB8000 Issue 3.0 ___________________________________________________________________________________ PVID ECTION This screen allows users to configure assign priorities to the VLAN ID ingress ports. The Port PVID screen provides parameters for managing ports that are part of a VLAN. Port – defines the CD-ETIA port 1~ 8 included in a VLAN.
  • Page 40: Vlan Configuration

    Issue 3.0 SMB8000 ___________________________________________________________________________________ Figure 5-10 Port PVID (9~16) Screen VLAN C ECTION ONFIGURATION This screen allows users to view current VLAN settings and configure add or modify VLAN settings for ports. The CD-ETIA can be used to connect to other devices that have been configured to use VLANs.
  • Page 41: Section 8 Vlan Configuration

    SMB8000 Issue 3.0 ___________________________________________________________________________________ Add/Modify VLAN Designate the new VLAN ID Adding new VLAN ID This is to ensure priority treatment of the VoIP traffic by the system. Click OK to confirm. Click Refresh if your web page cannot be displayed or to ensure the latest version of the page is displayed.
  • Page 42: Firmware Download

    Once you have browsed for the file select Send. Selecting the cancel button will omit all actions. This firmware is provided by NEC and must be stored locally prior to selecting the send button. Click Home to return to the Home Menu.
  • Page 43: Figure 5-13 Firmware Download Screen

    SMB8000 Issue 3.0 ___________________________________________________________________________________ The firmware update will begin when this window is displayed. The window will count down to zero and restart the CD-ETIA once the update process is complete. Do not power off the system while the upload is in progress.
  • Page 44: Section 10 Session Management

    Issue 3.0 SMB8000 ___________________________________________________________________________________ ECTION ESSION ANAGEMENT This screen allows users to manage the site setup parameters and change the user password. Change Site Setup: Site Name – This field allow you to assign a Site Name to the CD-ETIA IP Address –...
  • Page 45 SMB8000 Issue 3.0 ___________________________________________________________________________________ Figure 5-14 Session Management Screen ___________________________________________________________________________________ Gigabit PoE Switch Manual 5 - 19...
  • Page 46: Section 11 Initialization

    Issue 3.0 SMB8000 ___________________________________________________________________________________ ECTION NITIALIZATION This screen allows users to initialize the NVRAM to the default setting and the allows the CD-ETIA blade to be rebooted. Reset NVRAM to Defaults – When selected will restore factory default setting removing any previously stored information (Site name, VLANs, Port Mirroring, etc.).
  • Page 47: Section 12 Configuration Download/Upload

    SMB8000 Issue 3.0 ___________________________________________________________________________________ ECTION ONFIGURATION OWNLOAD PLOAD This screen allows users to Download (restore) and/or Upload (save) the ETIA configuration settings. Figure 5-16 Configuration Download/Upload Screen Upload (Save Configuration File) When a user selects Upload, he or she is prompted to save the configuration file to a specific location.
  • Page 48: Figure 5-17 Save Configuration File To Specific Location

    Issue 3.0 SMB8000 ___________________________________________________________________________________ Figure 5-17 Save Configuration File to Specific Location ___________________________________________________________________________________ 5 - 22 Gigabit PoE Switch Web Manager...
  • Page 49: Figure 5-18 Select File For Configuration Download

    SMB8000 Issue 3.0 ___________________________________________________________________________________ Download (Restore Configuration File) To Download (restore) the ETIA configuration, press Browse to locate the locally stored “config.bin” file. Press Download. Figure 5-18 Select File for Configuration Download The restoration process is complete once the configuration files is restored and the ETIA automatically reboots.
  • Page 50 Issue 3.0 SMB8000 ___________________________________________________________________________________ ___________________________________________________________________________________ 5 - 24 Gigabit PoE Switch Web Manager...
  • Page 51: Appendix A Glossary

    Glossary Appendix A ___________________________________________________________________________________ ECTION ERMS AND EFINITIONS The following terms are used in this document. The term or acronym is listed as well as the associated definition. The terms are listed in alphabetical order. Term Definition Ethernet Ethernet is a family of frame-based computer networking technologies for local area networks (LANs).
  • Page 52 Issue 3.0 SMB8000 ___________________________________________________________________________________ Term Definition Real-Time Transmission Real-Time Transmission is transmission in which there is no perceived delay in the transmission of a voice message or the response to it. This is a requirement for voice traffic. Subnet Mask A number used to identify a subnetwork so that an IP address can be shared on a LAN.
  • Page 53: Appendix Bcd-Etia Limitations

    CD-ETIA Limitations Appendix B ___________________________________________________________________________________ ECTION IMITATIONS When using the SV8100 withe NetLink it is recommended to use an external Ethernet switch in place of the CD-ETIA for the Secondary systems. This is because when NetLink integrates the systems together it performs a slot reset on all Secondary systems.
  • Page 54 Issue 3.0 SMB8000 ___________________________________________________________________________________ ___________________________________________________________________________________ B - 2 CD-ETIA Limitations...
  • Page 56 SMB8000 Gigabit PoE Switch Manual NEC Unified Solutions Issue 3.0...

Table of Contents