Connecting
5.1
Handling
In the case of inexpert handling or handling malpractice, the electric safety of the device
cannot be guaranteed.
5.2
Installation regulations
The local regulations or VDE 0100 (Regulations of German Electro technical Engineers) must
be observed.
5.3
Power supply switch
A power-supply-disconnecting switch must be provided and marked near the device.
5.4
Wiring diagram
The electrical connections have to be made according to the wiring diagram.
5.5
Supply voltage
Compare the supply voltage applied with the specifications given on the name plate before
switching the device on.
The unit must be supplied from a SELV source providing electrical isolation between the input
and output, in order to meet the applicable safety requirements of IEC 61010-1.
Observe reduced supply voltage ratings in wet locations. A wet location is a location where
water or other conductive liquid may be present and is likely to increase the risk of electric
shock.
5.6
Cable gland and field wiring cables
With use of terminal block and cable gland:
The screwed cable gland must have following specifications:
• Ingress protection IP68
• Temperature range from -40°C to 10 K above max. ambient temperature
SITRANS LCS100 I/O Link Version
Operating Instructions, 05/2023, A5E52382716-AA
5
21