Siemens SITRANS LCS100 Operating Instructions Manual
Siemens SITRANS LCS100 Operating Instructions Manual

Siemens SITRANS LCS100 Operating Instructions Manual

Capacitance switches
Table of Contents

Advertisement

Quick Links

SITRANS LCS100 I/O Link Version
SITRANS L
Capacitance switches
SITRANS LCS100 I/O Link Version
Operating Instructions
7ML700/7ML701 (compact enclosure)
7ML702 (rod version)
7ML703 (cable version)
05/2023
A5E52382716-AA
Introduction
Safety notes
Description
Installing/mounting
Connecting
Operating
Service and maintenance
Diagnostics and
troubleshooting
Technical specifications
Dimension drawings
Options and accessories
Product documentation and
support
1
2
3
4
5
6
7
8
9
10
11
A

Advertisement

Table of Contents
loading

Summary of Contents for Siemens SITRANS LCS100

  • Page 1 SITRANS LCS100 I/O Link Version Introduction Safety notes SITRANS L Description Installing/mounting Capacitance switches SITRANS LCS100 I/O Link Version Connecting Operating Operating Instructions Service and maintenance Diagnostics and troubleshooting Technical specifications Dimension drawings Options and accessories Product documentation and support...
  • Page 2 Note the following: WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems.
  • Page 3: Table Of Contents

    Probe mounting distances - liquids ..................17 Solids applications ......................17 4.4.1 LCS100 compact version ....................17 4.4.2 LCS100 rod version ......................19 4.4.3 Probe mounting distances - solids ..................20 Connecting ............................21 Handling..........................21 SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 4 7.2.4 Production date ......................... 56 7.2.5 Function test ........................57 7.2.6 Impermissible repair and maintenance of the device ............57 7.2.7 Spare parts ........................57 Ordering of spare parts ...................... 57 SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 5 G 1/2" hygienic process connection/EHEDG approval ............74 Options and accessories ........................76 11.1 Options and accessories ..................... 76 Product documentation and support ....................77 Product documentation ..................... 77 Technical support ......................78 Index ..............................79 SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 6: Introduction

    In order to protect plants, systems, machines and networks against cyber threats, it is necessary to implement – and continuously maintain – a holistic, state-of-the-art industrial security concept. Siemens’ products and solutions constitute one element of such a concept. Customers are responsible for preventing unauthorized access to their plants, systems, machines and networks.
  • Page 7: Transportation And Storage

    Siemens’ products and solutions undergo continuous development to make them more secure. Siemens strongly recommends that product updates are applied as soon as they are available and that the latest product versions are used. Use of product versions that are no longer supported, and failure to apply the latest updates may increase customer’s exposure to...
  • Page 8: Notes On Warranty

    The sales contract contains all obligations on the part of Siemens as well as the complete and solely applicable warranty conditions. Any statements regarding device versions described in the manual do not create new warranties or modify the existing warranty.
  • Page 9: Safety Notes

    Means important information about the product or that part of the operating manual. Safety marking symbols In manual On Product Description Caution: refer to accompanying documents (manual) for details. Earth (ground) Terminal Protective Conductor Terminal SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 10: Preconditions For Use

    If you need additional information not covered by these instructions, contact your local Siemens office or company representative. Note Operation under special ambient conditions...
  • Page 11: Description

    Description Measurement principle The SITRANS LCS100 detects the capacitance around its probe. Due to the active shield technology it has an increased insensitivity to material buildup on the probe. Application The SITRANS LCS100 is a capacitance switch for: • Level detection of liquids, solids (powder and granules), slurries and foam •...
  • Page 12 • Pipe extension (max. 4m [157,5"]), optional sliding sleeve allows to change the switch point easily during operation of the device • Various process connections: threaded (including G½“ hygienic), flanged (screwed) or Tri- clamp SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 13: Installing/Mounting

    • Make sure that process connectors are clean, and suitable gaskets and glands are used. • Mount the device using suitable tools. Refer to the information in Technical specifications (Page 61). SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 14: Mounting

    Ensure proper seal of the process connection thread in case of process pressure. Hygienic process connection Observe that the correct "On site process connection" is present, see G 1/2" hygienic process connection/EHEDG approval (Page 74). SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 15: Liquids Applications

    ⑧ Demand or empty detector horizontal ⑨ Empty detector vertical from the bottom Vertical pipe ⑩ Full, demand or empty detector horizontal Bypass ⑪ Full detector horizontal ⑫ Demand or empty detector horizontal SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 16: Lcs100 Rod Version

    ④ Vertical from bottom Horizontal vessel ⑤ Full, demand, or empty detector vertical ⑥ Vertical with sliding sleeve ⑦ Vertical with long mounting socket Bypass ⑧ Full, demand, or empty detector vertical SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 17: Probe Mounting Distances - Liquids

    • General distances of the probe, see Probe mounting distances - solids (Page 20). • Distance to material flow (filling) • Max. permitted mechanical load, see Environmental (Page 65). • Wearing due to abrasive bulk material SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 18 Protective angle recommended depending on load and abrasion of the material ③ Empty detector oblique from the bottom ④ Empty detector in the silo outlet SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 19: Lcs100 Rod Version

    ④ Demand or empty detector horizontal or oblique. Slight incline mounting helps remaining material to fall off more easily. Protective angle recommended depending on load and abrasion of the ma- terial SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 20: Probe Mounting Distances - Solids

    Observe mounting angle to ensure, that the active tip of the probe has enough distance to the metal silo wall. Observe minimum distance between two probes, to metal vessel wall, and to protective angle. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 21: Connecting

    With use of terminal block and cable gland: The screwed cable gland must have following specifications: • Ingress protection IP68 • Temperature range from -40°C to 10 K above max. ambient temperature SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 22: M12 Mating Plug And Field Wiring Cables

    Protection against static charging The unit must be earthed in any case to avoid static charging of the unit, especially on applications with pneumatic conveying. Functional earthing is satisfactory to protect against static charging. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 23: Functional Earthing

    The unit must have connection to earth for proper functioning using one of the methods below. Earthing through metal process connection ① Use flat sealing ② Do not use PTFE (Teflon) tape ③ Metal process connection ④ Metal nozzle ⑤ Metal vessel (earthed) SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 24: Electrical Ratings

    10 to 30 V DC incl 10% of EN 61010-1 Operation with IO-link requires min. 18V <55 mA Signal outputs (Out1, Out2) One output active: max. 200 mA Both outputs active: max. 100 mA each SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 25: Output Type

    Since the M12 thread on LCS100 is made of plastics, the cable shield on the M12 cap nut is not connected with LCS100 and must be connected on the other side to ground. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 26: Output Logic

    FSL = Fail safe low FSH = Fail safe high Factory setting of output logic: Out 1 is set to FSL, Out 2 is set to FSH. Output logic can be changed in IO-Link registers. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 27: Operating

    LED white ⑨ Remove sealing cap for potentiometer ④ LED yellow ⑩ Sensitivity ⑤ LED green ⑪ High ⑥ Potentiometer ⑫ Potentiometer: 15 turns ⑬ LEDs Green Power on Power off SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 28 Both LEDs blink Blinking happens when the potentiometer is turned. White 5 times, then The potentiometer is not valid. Calibration stop blinking by IO-Link is set. See also Advanced calibration (Page 32) SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 29: Operation With Potentiometer

    3.0 ... 5.0 -5mm (-0.2")* 8mm (0.3") 5 ... 10 -8mm (-0.3")* 5mm (0.2") >10 ... 40 -10mm (-0.4")* 3mm (0.1") * Switchpoint is below the probe (material not touching the probe) SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 30 As a result, no on site calibration is required for general applications. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 31: Recalibration

    (Page 20) and that the Sensguard (see Options and accessories (Page 76)) is not used. Depending on the application and the required switchpoint, the number of turns can be varied. 3. Switchpoint setting is finished. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 32: Advanced Calibration

    1. Ensure material level is well above the probe. 2. Ensure material level is well below the probe. It is important that as much material buildup as possible is retaining on the probe. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 33 - solids (Page 20) and that the Sensguard (see Options and accessories (Page 76)) is not used. Depending on the application and the required switchpoint the number of turns can be varied. 4. Switchpoint setting is finished. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 34 (Page 20) and that the Sensguard, see Options and accessories (Page 76) , is not used. Depending on the application and the required switchpoint, the number of turns can vary. The sensitivity is now set so that liquid A or foam is NOT detected. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 35: Advanced Calibration - Measurement Through Non-Metal Vessel Wall

    Advanced Calibration - Measurement through non-metal vessel wall Switchpoint setting - Measurement through non metal vessel wall Typical application On site calibration Measuring through non metal vessel wall Material below probe SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 36 Number of turns material terial to probe) >= 3 <= 10mm (0.4") > 40 <= 20mm (0.8") Depending on the application and the required switchpoint, the number of turns can vary. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 37: Advanced Possiblities

    Number of blinking of yellow LED, constant of material to be ter = No. of potentiometer see (3) below detected (1) turns, see (2) below not applicable (see below) 0 ... 2 1 (Probe in air) SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 38: Operation With Io-Link

    Smart Sensor Required IO-Link master as per DIN EN 61131-9 Speed COM2 (38,4 kBaud) Min. process cycle time 128 ms Process data width 16 bit IO-Link data storage Block parameter SIO-Mode SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 39 Siemens AG Name Product String Name Product Text 20 String Capacitance point level switch Serial num- String Hardware String Revision Firmware String Revision Application- String specific Tag Function Tag 25 String SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 40 0 ... 10000 (equates to 0.00% - 4.00% ** Switchpoint: 100.00%) uncovered to covered * Out 2: UInt 0 ... 10000 (equates to 0.00% - 3.00% ** Switchpoint: 100.00%) covered to uncovered * SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 41 ISDU = Indexed Service Data Unit R/W = read/write FSL = Fail safe Low = output contact open with uncovered sensor FSH = Fail safe High = output contact open with covered sensor SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 42: Setting Of Signal Outputs

    30 seconds, to CCW (or CW) stop position. • By setting back to potentiometer the switchpoint registers will be overwritten according to the actual position of the potentiometer. Usually a new calibration by potentiometer is required. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 43: Switchpoint Setting - Level Detection Of General Applications

    Out 1, uncovered probe ⑥ Switchpoint covered to uncovered ③ Out 2, uncovered probe ⑦ Switchpoint uncovered to covered ④ Out 2, covered probe ⑧ Covered probe ⑨ Actual measured value SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 44 - liquids (Page 17) and Probe mounting distances - solids (Page 20) • The Sensguard (see Options and accessories (Page 76) ) is not used • Conductive material is not present SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 45: Operation With Io-Link - Advanced Calibration

    Probe covered and then uncovered, retaining • Material with heavy buildup (non conductive): max. possible material buildup • High viscosity liquids • Hygroscopic/ wet solids Consult manufacturer • Heavy buildup (conductive) SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 46 • Out 1 set to FSL • Out 2 set to FSH • 1 = contact closed • 0 = contact open Pin assignment with PNP, NPN, Push-Pull: see Output logic (Page 26) SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 47 - solids (Page 20) and that the Sensguard (see Options and accessories (Page 76)) is not used. Depending on the application and the required switchpoint, the values ⑥ and ⑦ can vary 4. Switchpoint setting is finished. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 48 * For interface measurement "Uncovered probe" relates to a probe covered by Liquid A or foam The diagram shows: • Out 1 set to FSL • Out 2 set to FSH • 1 = contact closed • 0 = contact open SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 49 3. Immerse probe in liquid B, which should be detected. Ensure that liquid B is covering the probe. LED white glows. ① Liquid A or foam ② Liquid B ③ LED white 4. Switchpoint setting is finished. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 50 Covered probe ⑨ Actual measured value The diagram shows: • Out 1 set to FSL • Out 2 set to FSH • 1 = contact closed • 0 = contact open SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 51 Depending on the application and the required switchpoint, the values ⑥ and ⑦ can be varied. 3. Ensure material level is well above the probe. LED white glows. 4. Switchpoint setting is finished. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 52 ⑥, ⑦, ⑨, ⑩. Dielectric constant of material ⑥ (Out 1) Switchpoint covered ⑦ (Out 1) Switchpoint uncov- to uncovered ered to covered <2 B=3.00% C=4.00% 2 ... 4 B=5.20% C=7.00% >4 B=7.50% C=10.00% SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 53: Advanced Possibilities

    • The probe is mounted inside the vessel (no measurement from outside through the vessel wall). • The Sensguard, see Options and accessories (Page 76), is not used. • Conductive material is not present. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 54: Whg Proof Test

    Simulation of the level Suitable simulation of the level or of the physical measurement effect. This can be done, for example, by dismounting the sensor and immersion into the original medium. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 55: Service And Maintenance

    WARNING Opening the lid (cover) Before opening the lid for maintenance reasons observe following items: • No dust deposits or whirlings are present. • No rain can enter into the housing. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 56: Cleaning

    7.2.3 Max. temperature for CIP WARNING Max. temperature for CIP 135°C (275°F), duration 60min 150°C (302°F), duration 30min (only for SITRANS LCS100 with process connection G 1/2" hygienic) Ambient temperature limited to 50°C (122°F), unit de-energized. 7.2.4 Production date WARNING Production date The production date can be traced by the serial number on the nameplate.
  • Page 57: Function Test

    7.2.6 Impermissible repair and maintenance of the device WARNING Impermissible repair and maintenance of the device • Repair and maintenance must be carried out by Siemens authorized personnel only. 7.2.7 Spare parts WARNING Spare parts All available spare parts are stated in the selection list.
  • Page 58: Transport

    5. Select a spare part and add it to your watch list. The watch list opens. 6. Click "Add to cart of Industry Mall". The Siemens Industry Mall opens and you can order your spare part. Transport Observe the instructions as stated on the transport packaging, otherwise the products may get damaged.
  • Page 59: Storage

    To return a product to Siemens, see Returns to Siemens (www.siemens.com/returns-to- siemens). Contact your Siemens representative to clarify if a product is repairable, and how to return it. They can also help with quick repair processing, a repair cost estimate, or a repair report/cause of failure report.
  • Page 60: Diagnostics And Troubleshooting

    LED. ON or OFF ON or OFF No respond (change of Defective component in Contact distributor. white and yellow LED) device. when potentiometer is turned and probe is uncovered. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 61: Technical Specifications

    Technical specifications Specifications Note Siemens makes every attempt to ensure the accuracy of these specifications, but reserves the right to change them at any time. Power Power Supply 10 - 30 V DC, incl. 10% of EN 61010-1 Operation with IO-Link requires min. 18V Current consumption: <55mA...
  • Page 62: Performance

    DN25 (1"), DN40 (1 1/2"), DN50 (2") DIN 32676 Type A (DIN 11851) and DIN 32676 Type C (ASME BPE 2009) Flange (screwed) DN 25, 40, 50; ASME 1", 1 1/2”, 2" SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 63 (PC) Material Seal between hous- VMQ (vinyl-methyl-silicone) VMQ (vinyl-methyl-silicone) ing and lid Material Nameplate polyester film polyester film Ingress protection: Type 4X / IP68 Sound level: n/a (no sound is produced) SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 64 Stainless steel process conn.: 0.35 kg (0.77 lbs) Plastic process connection: 0.25 kg (0.55 lbs) Pipe extension: 0.6 kg (1.32 lbs) + 0.85 kg/m (1.87 lbs per 39.3“) All weights with threaded process connection. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 65: Environmental

    ③ Ambient- and process temperature limited to ⑦ Ambient- and process temperature limited -20°C (-4°F) with option FFKM seal O-ring to -20°C (-4°F) with option FFKM seal O-ring ④ LCS100 Rod version ⑧ LCS100 Rod version SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 66: Process

    SITRANS LCS100 rod version –1 to 25 bar (363 psi) from the flange SITRANS LCS100 rod version with sliding sleeve –1 to 10 bar (146 psi) type used! SITRANS LCS100 cable extension –1 to 10 bar (146 psi)
  • Page 67: Approvals

    20, A-25)" * Not all approvals are available with all models, see selection list for more information ** Relevant information for use in applications with WHG/VLAREM II: see external documentation "Technical Description" SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 68: Dimension Drawings

    G 1/2" G3/4" G1" Top view NPT 3/4" ① See possible wiring options below ② Short extension length version with stainless steel process connection are available with certificate EHEDG EL class I SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 69 Dimension drawings 10.1 Short extension length Enclosure Ø35mm (1.38") Top View ① Short extension length version with stainless steel process connection are available with certificate EHEDG EL class I SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 70 Dimension drawings 10.1 Short extension length Compact version: Plastic process connection Enclosure Ø65mm (2.56") ① See possible wiring options below Enclosure Ø35mm (1.38") SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 71: Pipe Extension

    10.2 Pipe extension 10.2 Pipe extension Pipe extension Pipe extension Top view ① See possible wiring options below Enclosure Ø65mm (2.56") Possible wiring M20x1.5 cable gland 1/2" NPT conduit M12 plug SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 72: Tri-Clamp And Flange

    Enclosure Ø65mm: 131 (5.2) Enclosure Ø35mm: 110 (4.3) ØD DN 25 (1") 50.5 (1.99") DN 40 (1 1/2") 50.5 (1.99") DN 50 (2") 64 (2.52") Flange The flange is screwed to the process connection SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 73 DN25 14.0 (0.55) 85.0 (3.35) 115.0 (4.53) 18.0 (0.71) PN16/40 Flat-faced DN40 18.0 (0.71) 110.0 (4.33) 150.0 (5.91) 18.0 (0.71) PN16/40 DN50 18.0 (0.71) 125.0 (4.92) 165.0 (6.5) 18.0 (0.71) PN16/25/40 SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 74: G 1/2" Hygienic Process Connection/Ehedg Approval

    In tanks, the cleaning device must be positioned in such a way that the sensor is directly assessed and wetted for cleaning. SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 75 EHEDG Guidelines 9 and 35. Suitable pipe couplings and pro- cess connections with the applicable gaskets must be applied according to the EHEDG Position Paper "Easy cleanable Pipe couplings and Process connections". SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 76: Options And Accessories

    G 1/2" to fit in). Material: PPS Max. process pressure: –1 to 10 bar (146 psi) Complementary products (from outside companies) M12 mating plug 4 pole, for version with M12 plug SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...
  • Page 77: Product Documentation And Support

    Entering a serial number 1. Open the PIA Life Cycle Portal (https://www.pia-portal.automation.siemens.com). 2. Select the desired language. 3. Enter the serial number of your device. The product documentation relevant for your device is displayed and can be downloaded.
  • Page 78: Technical Support

    In addition to our technical support, Siemens offers comprehensive online services at service & support (http://www.siemens.com/automation/serviceandsupport). Contact If you have further questions about the device, contact your local Siemens representative at Personal Contact (http://www.automation.siemens.com/partner). To find the contact for your product, go to "all products and branches" and select "Products &...
  • Page 79: Index

    10 improper, 10 power requirements general purpose/intrinsically Safe, 61 process connections, 63 Return procedure, 59 Scope of delivery, 6 Service, 78 Service and support Internet, 78 Support, 78 Support request, 78 SITRANS LCS100 I/O Link Version Operating Instructions, 05/2023, A5E52382716-AA...

This manual is also suitable for:

7ml7007ml7017ml7027ml703

Table of Contents