Stationary Equipment (For North America, Latin America, Australia); Fixed Equipment 1 (For North America, Latin America, Australia); Fixed Equipment 2 (For Asia, Africa, Europe, Middle East) - NEC NEAX 2000 IPS Installation Manual

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

Stationary Equipment (For North America, Latin America, Australia)

The equipment is placed on the BASE TRAY which is fixed on the floor, and is connected to 120 V/240 V
AC Power Source using AC CORD-D cable.
For installation of Stationary Equipment, see the following pages.
WIRING AC CABLE TO TERMINALS
INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE TRAY

Fixed Equipment 1 (For North America, Latin America, Australia)

The equipment is fixed on the floor by BASE PLATE and anchor bolts, and is connected to AC Power
Distribution Board using installation cable.
For installation of this equipment, see the following pages.
WIRING AC CABLE TO TERMINALS
INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE PLATE

Fixed Equipment 2 (For Asia, Africa, Europe, Middle East)

The equipment is fixed on the floor by BASE PLATE and anchor bolts, and is connected to 120 V/240 V
AC Power Source using AC CORD-D cable.
For installation of this equipment, see the following pages.
WIRING AC CABLE TO TERMINALS
INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE PLATE
- Using AC CORD-D
- Installation of Module, For Stationary
Equipment
Page 83
- Using Installation Cable
- Installation of Module, For Fixed Equipment
Page 83
- Using AC CORD-D
- Installation of Module, For Fixed Equipment
Page 83
– 74 –
CHAPTER 2 INSTALLATION
PROCEDURE
Page 76
Page 86
Page 78
Page 86
Page 76
Page 86
NWA-008841-001 Rev.5.0
90ch2001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents