Operation - Makita TW0200 Instruction Manual

Hide thumbs Also See for TW0200:
Table of Contents

Advertisement

1
2
1. Socket
2. O-ring
3. Pin
1
1. Hook

OPERATION

Standard bolt
200
180
M16X80
160
140
120
100
M12X80
80
60
M10X80
40
20
0
1
2
Fastening time (S)
6
For socket with O-ring and pin
Move the O-ring out of the groove in the socket and remove the pin from the
003999
socket. Fit the socket onto the anvil of the tool so that the hole in the socket is
3
aligned with the hole in the anvil. Insert the pin through the hole in the socket
and anvil. Then return the O-ring to the original position in the socket groove to
retain the pin. To remove the socket, follow the installation procedures in
reverse.
Hook
The hook is convenient for temporarily hanging the tool. This can be removed
without using a tool.This can be installed on either side of the tool.
Installing and removing hook
004000
Expand the upper part of the hook in both directions and remove it. To install
the hook, follow the removal procedure in reverse.
The proper fastening torque may differ depending upon the kind or size of the
004238
bolt, the material of the workpiece to be fastened, etc. The relation between
fastening torque and fastening time is shown in the figures.
Hold the tool firmly and place the socket over the bolt or nut. Turn the tool on
and fasten for the proper fastening time.
NOTE:
When fastening screw M10 or smaller, carefully adjust pressure on the
switch so that the screw is not damaged.
M16
Hold the tool pointed straight at the bolt or nut without applying excessive
pressure on the tool.
If you fasten the bolt for a time longer than shown in the figures, the bolt
M12
or the socket may be overstressed, damaged, etc. Before starting your
M10
job, always perform a test operation to determine the proper fastening
time for your bolt. Especially for the bolt over than M10, perform the
4
3
above test operation to prevent the trouble on socket or bolt, etc.

Advertisement

Table of Contents
loading

Table of Contents