Step 10, Install Filters; Step 11, Finalize Installation - GE ZV855 Installation Instructions Manual

Island vent hood
Hide thumbs Also See for ZV855:
Table of Contents

Advertisement

Available languages

Available languages

Instollotion
Instructions
INSTALLATION -VENTED
TO THE OUTSIDE
INSTALL FILTERS
• Remove protective
film on filters.
• Tip the filter into the lower chonnel
(It the re(It
of the opening.
Push b(]ck, lift (]nd pull the knob
forw(]rd
until the filter rests on the ch(]nnel.
\
Lower Filter
Channels
• Inst(]ll (]11 three met(]l gre(]se filters.
\\
\
\
\
• Turn power on. If the filter light on the control p(]nel
glows, (]djust the right-side filter in the ch(]nnel to
eng(]ge the switch (]rm.
\
FINALIZE INSTALLATION
• Remove the protective film covering the control p(]nel
on the front f(]ce of the hood (]nd (]ng other p(]ck(]ging
m(]teri(]ls.
• M(]ke sure the filters (]re se(]ted properlg when
inst(]lled (]nd the filter light is not on.
• Be sure f(]n (]nd lights oper(]te correctlg. Refer to
the Owner's M(]nu(]l for oper(]ting
instructions
(]nd the Problem Solver.
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv850

Table of Contents