Installation - Vented To The Outside; Step 1, Mount Template; Step 2, Install Upper Support Frame; Step 3, Install Lower Support Frame - GE ZV855 Installation Instructions Manual

Island vent hood
Hide thumbs Also See for ZV855:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
INSTALLATION -VENTED
TO THE OUTSIDE
MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
- Be sure the template is oriented correctlLh with the
front of the hood.
• Use o plumb to be sure the mounting holes will provide
parallel alignment with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw
locutions. Use a 5/32" bit and drill
approximatelg
1-1/2" deep.
• Cut wire access hole
i
approximatelg
1" diG.
Frontof Hood
• Cut the 6-1/2" duct opening
'
O
'
\\
/
through the ceiling.
"- - -_"
Wire AccessHole
_-1 INSTALL UPPER SUPPORT FRAME
• Secure the upper support frame to the ceiling
joists and/or
cross framing with the 4 screws
provided. For maximum
rigiditg and strength, the
screws must be driven into the center of the joists
and/or cross-framing.
• Check to be sure the support frame is level,
verticallg
and horizontallg.
i
Upper J
Support
Frol
Frame
Of
He(
]art
Frame
Opening
Lower
Support
Frame
_ Check Level i n
BothDirections
Hood
Mounting
Flange
_-1 INSTALL LOWER SUPPORT FRAME
• Insert lower support frame into the upper support
frame and Iooselg secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.
.....
Lowers
ummg_
///
,ano ii
............
i.........
13-5/8"
/
24" Minimum
30" Maximum
Countertop
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no wag to level the
hood after the hood is secured to the frame.
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv850

Table of Contents