Step 3, Install Lower Support Frame; Step 4, Secure Wiring; Step 5, Size And Install Ductwork - GE ZV855 Installation Instructions Manual

Island vent hood
Hide thumbs Also See for ZV855:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
INSTALLATION - RECIRCULATING
_-1 INSTALL LOWER SUPPORT FRAME
• Insert lower support frame into the upper support
frame and Iooselg secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no wag to level the
hood after the hood is secured to the frame.
Hood
Mounting _
Flange
:::[:::Fi_7 : :[: :.
L
13-5/8"
/
,-
.
.,,
....
..
|
24" Minimum
30" Maximum
Countertop
II
SECURE WIRING
• Route house wiring through
the ceiling hole
and pull a length to reach the hood junction
box.
FrontSide
Support_
Frames
_
\_
\,\
?
?
g
o
?
?
C_e ling
House
Wiring
• Tape the wire to the front of the frame support to
prevent damage
during installation
and service.
_-1 SIZE AND INSTALL DUCTWORK
• Measure from top duct connector
(Dim. A)
to bottom
of support frame.
- Subtract 3/4" for hood insertion into the bottom
of the frame.
• Cut the 6" dio. duct to the required length.
Ceiling
/
DuctConnector
--...
--....
Side
View
Support
Frame
DuctConnection
ToHood........
..... I....
I
Dim. A
::Required
Duct
Duct
Length
=
i
BottomSupport
Frame Flange
NOTE: The bottom end of the duct must be flared
slightlg, to facilitate
installation
of the hood.
• Install duct up through
support frames onto the
duct connector.
Push duct up until it is 3/4" from
the bottom
of the support frame flange. See
illustration.
• Seal duct connection
with duct tape, making sure
the connection
is secured in place.
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv850

Table of Contents