Installation - Redrculating; Step 1, Mount Template; Step 2, Install Upper Support Frame - GE ZV855 Installation Instructions Manual

Island vent hood
Hide thumbs Also See for ZV855:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
INSTALLATION - RECIRCULATING
_-] MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
- Be sure the template is oriented correctlg, with the
front of the hood.
• Use a plumb to be sure the mounting
holes will provide parallel alignment
with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw
locations. Use a 5/32" bit and drill
approximatelg 1-1/2" deep.
• Cut wire access hole approximatelg
1" dia.
r o
o_
i
\o Front of Hood o
_-1 INSTALL AIR DEFLECTOR AND
UPPER SUPPORT FRAME
The duct connector is shipped insidethe deflector.
• Snap the plastic connector out of
the deflector and remove. Turn it
over. From the bottom, snap the
connector over the opening.
• Slide the assembled deflector into
the upper support frame and secure
with 4 small screws.
• Securethe upper support frame to
the ceilingjoists and/or cross framing
with the 4 screws provided. Formaximum rigiditg
and strength, the screws must be driven into the center
of the joists and/or cross framing.
• Check to be sure the support frame is level, verticallg
and horizontallg.
Install
4 Screws
]
Support
Upper
i_ Frame
Support
Opening
Frame
-
.......... _/Check
Levelin
Lower
_
_.-_: _Both
Direc[ions
Support <- ........ m
:::_-:::_* . ...
Frame
....
"'J.........
Hood
Mounting
Flange
Assembled
i Air Deflector
/
/
NOTE:Besureplastic
connector i s installedon
the bottomof the
deflectorasshown.
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv850

Table of Contents