Check Installation Hardware; Ductwork, Wiring Locations - GE ZV950 Installation Instructions Manual

36" stainless steel vent hood
Hide thumbs Also See for ZV950:
Table of Contents

Advertisement

Installation
Preparation
CHECK INSTALLATION
HARDWARE
Locate the hardware accessory box packed with the hood
and check contents.
_s
0 Wood
_
6 Wall
crews
_
Fasteners
2 Large
Flat Washers
2 Mounting Brackets with 4
Hex Head Leveling Screws
2 PhillipsHead
DecorativeScrews
3 Stainless
Steel Grease Filters
Duct Cover Bracket
2-piece
Decorative Duct Cover
(dimension shown
for reference only)
f
I s..................
,
i
i
Wall Mount Template
DUCTWORK,
WIRING LOCATIONS
Determine the exact location of the vent hood.
• Locate the template packed with the literature.
- Measure 36" from the floor to the top of the cooking
surface. Add 25-1/2" (or other recommended space)
from the cooking surface to the bottom of the hood.
Hark that location.
- Use a level to draw a straight pencil line on the wall.
/FOR CEILING
6-1/4"
(
VENT
DUCTING
Centerline ToW
8-1/2" Dia.HOI_
__
i
i
\\\\\\
i
'
Centerline
_',.i',_/"Z'8'' Min Ab°ve
,_
Top Mounting
FOR WALL
VENT
DUdT_
BracketHoles
.
i
_J
i
i
i
i
............ i
!P'
i
- Tape the template in position along the penciled line.
CHECKTO BE SURETHETEMPLATEIS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
• Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
• IVleasure 6-1/4" from the back wall to the centerline of
a 8-1/2" hole on the ceiling.
Note: If drywall is not present,add drywall thickness
to the 6-1/4" dimension.
Wall Ducting:
If ductwork will vent to the rear:
• Use the level to draw a line straight up from the
centerline on the template.
• IVleasure at least 8" above the top mounting bracket
holes shown on the template to the centerline of an
8-1/2" dia. duct hole. (Hole may be elongated for duct
elbow.)
HOUSE WIRING LOCATION:
• The junction
box is located on the top of the hood, at
the back right side.
• Route house wiring as close to the ceiling location
as
possible, through
the ceiling, sofiqt or back wall. Wiring
should enter at least 4" above the bracket on the right
side (no less than 18" above the planned
lower edge of
hood and ideally, 4" to the right of planned
ductwork.)

Advertisement

Table of Contents
loading

Table of Contents