Installation
Instructions
INSTALL FRAMING
FOR HOOD SUPPORT
I IMPORTANT: Framing
must be capable
of supporting
100 Ibs.
8" Min. Opening for Ductwork
II
II
Centerline
o-
tnst(]ll(]tion
Sp(]ce
View From Rec]¢_
1" x 6" Min.
Mounting
Support
/
/
If drywall is present, mark the screw hole locations for the
top mounting brockets. Remove the template.
• Cutaway enough drywall to expose 2 vertical studs at the
bracket location indicated on the template.
• Install (_ horizontal support at least l"x 6" between two
wall studs (It the top bracket installation location. The
horizontal support must be flush with the room side of
the studs. Use cleats behind both sides of the support
to secure the support to wall studs.
• Reinstall drywall.
_-1 INSTALL MOUNTING
BRACKETS
This vent hood must be secured
to the horizontal
support
or
wall studs.
• With the template taped in place, use (] punch to mark
all mounting screw locations.
• Drill 1/8" pilot holes at the 6 punched Iocotions.
• Remove the template.
• The 4 support bracket holes must enter studs or the
horizontal support.
Note: Screws "A" and "B"
(Ire pre-assembled onto
the brackets. Do not
remove these screws.
• Secure the mounting brockets to the wall studs with
wood screws provided.