Check Installation Hardware - GE Monogram ZV950 Installation Instructions Manual

36" stainless steel vent hood
Hide thumbs Also See for Monogram ZV950:
Table of Contents

Advertisement

CHECK INSTALLATION HARDWARE

Screws
2 Large
Flat Washers
3 Stainless Steel Grease Filters
16"
24"
23"
11"
Decorative Duct Cover
Installation Preparation
6 Wall
Fasteners
2 Phillips Head
Decorative Screws
• Drill 1/8" Pilot Holes For Mounting Brackets.
C L
5-7/8"
C L
C L
Align edge 25-1/2" above Cooking Surface.
Wall Mount Template
DUCTWORK, WIRING LOCATIONS
6-1/4"
Centerline To Wall
8-1/2" Dia. Hole
FOR WALL VENT DUCT
Ceiling ducting:
centerline on the template to the ceiling.
Note:
Wall Ducting:
centerline on the template.
holes shown on the template to the centerline of an
HOUSE WIRING LOCATION:
8
FOR CEILING
VENT DUCTING
Centerline
8" Min. Above
Top Mounting
Bracket Holes
• Drill 1/8" Pilot Holes For Mounting Brackets.
5-7/8"
C L
Align edge 25-1/2" above Cooking Surface.

Advertisement

Table of Contents
loading

Table of Contents