Installation Below Advantium; Installation Between Advantium And A Warming Drawer - GE Monogram ZET1038 Installation Instructions Manual

30" convection built-in oven
Hide thumbs Also See for Monogram ZET1038:
Table of Contents

Advertisement

Cabinetry
Installation
Below a
Monogram
Advantium
Oven
23-1/2" Min.
_-Inside_.
Installation
Between
a
Monogram
Advantium
Oven and
a Warming
Drawer
2" Min.
Note: Install the
oven only with
specific models
listed on the label
located on top of
the oven.
45-1/4"
NOTE: The middle rail separating the two openings
may need to be larger than the 2" minimum shown.
Always refer to the individual installation instructions
packed with each product for specific requirements.
Combined
Advantium
and Wall Oven
Installation:
When installed in combination with a Monogram single
wall oven, use separate electrical junction boxes,
OR,
Install a single junction box connected to 50 amp supply
circuit or properly rated supply circuit.
• Refer to the Advantium oven installation instructions
for electrical
requirements of that product.
• These connections must be made by a qualified
electrician. All electrical
connections must meet
National Electrical code or prevailing local codes.
Warming
Drawer
Combined
with
Advantium
and Single Oven:
Install a separate 120V,60Hz, properly grounded
receptacle. See installation
Instructions packed with
the Warming Drawer.
NOTE: Additional clearances
may be required.
Check to be sure the oven supports above the
Warming Drawer does not obstruct the required
interior 23-1/2" depth and 9-1/4" height. The middle rail
separating the openings may need to be larger than
the 2" minimum shown. Always refer to the individual
installation instructions
packed with each product for
specific requirements.
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zet1058

Table of Contents