Pre-Lnstallation Checklist - GE Monogram ZGU385N Installation Instructions Manual

36" stainless steel gas cooktops
Hide thumbs Also See for Monogram ZGU385N:
Table of Contents

Advertisement

Available languages

Available languages

Installation Preparation
PRE-INSTALLATION
CHECKLIST
1. When preparing
cooktop
opening, make sure
the inside of the cabinet and the cooktop
do
not interfere with each other. (See section on
preparing
the opening.)
2. Slide the cooktop out of the end of the box.
Remove packaging
materials, grate boxes,
regulator
and literature
package from the
cooktop
before beginning
installation.
• Use the shipping carton as a pad to )rotect
customer
countertops
or flooring.
Foam suppoR
Left and right side
grate boxes
,
,
,
.
,
Remove Installation
Instructions
from literature
package and read them carefully
before you
begin.
Be sure to place all literature,
Owner's Manual,
Installations,
etc. in a safe place for future
reference.
Hake sure you have all the tools and materials
you need before starting the installation
of the
cooktop.
Your home must provide the adequate
electrical
service needed to safely and properly
use your
cooktop. (Refer to section on electrical
requirements.)
When installing your cooktop in your home, make
sure all local codes and ordinances
are followed
exactly as stated.
Hake sure the wall coverings, countertop
and
cabinets around the cooktop can withstand
heat
(up to 200°F) generated
by the cooktop.
Regulator
taped to the
Center
Foam
grate box
packaging

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zgu385l

Table of Contents