Check and Storage

4
Check and Storage

4.1 Check Before Receiving

Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and other signs of
equipment damage. Do not unpack the package and contact the supplier as soon as possible if any
damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact the
supplier as soon as possible if any damage is found.

4.2 Deliverables

Inverter *1
AC connector *1
COM module *N
The number of PV connectors and the PV terminals in the inverter is the same.
The type and number of the communication connector are decided by the selected
communication method.
Communication module types: WiFi/LAN, WiFi, LAN etc. The actual module delivered depends
on the communication method of the selected inverter.
The number of pin terminals are various depending on different inverters. The actual accessories
may differ.
Mounting plate *1
Expansion bolt *6
Grounding screw
*1
DRED/Remote
Shutdown
connector*1
PV connector *N
CT/RS485
PIN Terminal *N
connector *1
Notice
10
User Manual V1.1-2022-08-01
or
Documents *1
OT terminal *1