Check And Storage; Check Before Receiving; Deliverables - GE GEP3.5-1-10 User Manual

3-5kw single phase
Table of Contents

Advertisement

User Manual V1.0-2022-05-05

4 Check and Storage

4.1 Check Before Receiving

Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and other
signs of equipment damage. Do not unpack the package and contact the supplier as soon as
possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.

4.2 Deliverables

Inverter *1
AC connector *1
COM module *N
• The number of PV connectors and the PV terminals in the inverter is the same.
• The type and number of the communication connector are decided by the selected
• communication method.
• Communication module types: WiFi/LAN, WiFi, LAN etc. The actual module delivered
depends on the communication method of the selected inverter.
• The number of pin terminals are various depending on different inverters. The actual
accessories may differ.
Mounting plate *1
Expansion bolt *6
Grounding
screw *1
DRED/Remote
Shutdown
connector*1
PV connector *N
CT/RS485
PIN Terminal *N
connector *1
Notice
9
Check and Storage
or
Documents *1
OT terminal *1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gep3.6-1-10Gep4.2-1-10Gep4.6-1-10Gep5.0-1-10

Table of Contents