4 Check and Storage

4.1 Check Before Receiving

Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and others
signs of equipment damage. Do not unpack the package and contact the supplier as soon as
possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.

4.2 Deliverables

• Connect the DC cables with the delivered terminals. The manufacturer shall not be liable
for the damage if other terminals are used.
• N represents the accessories' quantity delivered varies depending on the specific inverter
type. DC connector: 1 x PV+/PV- for GEH3.0-1LU-20 inverters; and 2 x PV+/PV- for other type
inverters.
Inverter *1
Smart Meter *1
Communication
module *1
2PIN terminal
*3
Mounting plate *1
DC connector *N
COM cable for Battery and
Meter *2
Battery connector *1
AC connector *2
3PIN terminal
*1
WARNING
Lead-acid battery
thermo sensor cable
*N
6PIN terminal
*1
17
04 Check and Storage
Expansion
OT terminal *1
bolt *3
Screwdriver *1
Battery power
Documents
terminal *2
Screw *N
*1