Installation; Installation Requirements - GE GEH User Manual

15-30kw three phase
Table of Contents

Advertisement

05

Installation

5
Installation
5�1 Installation Requirements
Installation Environment Requirements
1. Do not install the equipment in a place near flammable, explosive, or corrosive materials.
2. Do not install the equipment in a place that is easy to touch, especially within children's reach. High
temperature exists when the equipment is working. Do not touch the surface to avoid burning.
3. Avoid the water pipes and cables buried in the wall when drilling holes.
4. Install the equipment in a sheltered place to avoid direct sunlight, rain, and snow. Build a sunshade
if it is needed.
5. The place to install the equipment shall be well-ventilated for heat radiation and large enough for
operations.
6. The equipment with a high ingress protection rating can be installed indoors or outdoors. The
temperature and humidity at the installation site should be within the appropriate range.
7. Install the equipment at a height that is convenient for operation and maintenance, electrical
connections, and checking indicators and labels.
8. The altitude to install the inverter shall be lower than the maximum working altitude 4000m.
9. Install the equipment away from electromagnetic interference. If there are radio stations or wireless
communication equipment below 30 MHz near the installation location, please install the equipment
as follows:
Add a multi-turn winding ferrite core at the DC input line or AC output line of the inverter, or add
a low-pass EMI filter.
The distance between the inverter and the wireless EMI equipment is more than 30m.
Children No Touch
26
User Manual
V1.0-2023-10-30
≥300mm
≥200mm
≥300mm
≥500mm
≥1000mm

Advertisement

Table of Contents
loading

Table of Contents