Equipment Commissioning

7�1 Check Before Power ON
No�
1
The product is firmly installed at a clean place that is well-ventilated and easy-to operate.
The PE, DC input, AC output, and communication cables are connected correctly and
2
securely.
3
Cable ties are intact, routed properly and evenly.
4
Unused cable holes are fitted using the waterproof nuts.
5
The electrical conduit holes are sealed.
The voltage and frequency at the connection point meet the inverter grid connection
6
requirements.
7�2 Power On
Single Inverter
PV string
3
Battery breaker
Battery
Turn on:
4
Only for Australia.
Check Item
1
ON-GRID AC breaker
2
BACK-UP AC breaker
49
07
Equipment Commissioning
Utility meter
Load
Utility grid