This chapter covers the following topics:
Overview of the steps and tools required to install the D400
Tour of the product features
How to physically install the D400 in a rack or substation panel
CAUTION: Before you install and operate the D400, read and follow the safety guidelines
and instructions in section "1.1 Safety Precautions"
2.1
Installation Steps
The installation procedure will vary depending on the components ordered and shipped
with your D400. Follow the procedures in this manual that apply to the specific hardware
configuration of your D400.
»
Follow these main steps to install and set up the D400:
Mount the D400 in the rack or panel. See section "2.5 Physical Installation".
1.
Set up the communication cards. See chapter "3 Setting up Communication Cards".
2.
Make device and network connections. See chapter "4 Connecting to Devices and
3.
Networks".
Make power connections and verify operation. See chapter "5 Powering Up the
4.
D400".
Install the supplied battery on the D400 main board. See chapter "7.2 Replacing the
5.
Battery".
Set up communications with the D400. See chapter "6 Configuring the D400".
6.

Installing the D400