Hitachi Relion 670 Series Commissioning Manual page 105

Line distance protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK506371-UUS Rev. M
11.4.3.1
Phase-to-phase faults
IEC07000009 V4 EN-US
Figure 27:
Table 25:
Test
points
1
2
3
Change the magnitude and angle of phase-to-phase voltage to achieve impedances at test points 1, 2
and 3. For each test point, observe that the output signals, PICKUP, PU_x and PHPH_FLT are activated
where x refers to the actual phase to be tested. After the timer tPP for the actual zone has elapsed, also
the signals TRIP, TRPP and TR_x shall be activated.
11.4.3.2
Phase-to-ground faults
For simplicity, the same test points as for phase-to-phase faults are proposed, but considering new
impedance values.
Line distance protection REL670
Commissioning manual
X
3
50%
ZAngPP
Proposed test points for phase-to-phase fault
Test points for phase-to-phase (ohms / phase)
reach
Value
X
ZPP · sin(ZAngPP)
R
ZPP · sin(ZAngPP)
X
0,5· (ZPP· sin(ZAngPP)
R
0,5·ZPP + ΔR = 0,5·ZPP·(1+cos(ZAngPP))
X
0,5·ZPP·sin(ZAngPP)
R
0,5·ZPP - ΔR = 0,5·ZPP(1-cos(ZAngPP))
© 2017 - 2023 Hitachi Energy. All rights reserved
1
ZPP
2
R
Ohm/phase
IEC07000009-4-en.vsd
Testing functionality by secondary injection
Comments
Section 11
M14944-292 v8
M14944-393 v7
99