Download Print this page

Honeywell PMB-AUX-RTO Installation Document page 4

Advertisement

3.3 PMB-AUX-RTO
Mount the chassis into the second row of the backbox. Align the center hole on the edge of the chassis with the studs on the backbox and secure with
two supplied #8 keps nuts. (The FACP should be mounted in the top row.) If installing a second PMB-AUX-RTO, install the chassis in the third row
of the cabinet using the top mounting holes on the edge of the chassis. Refer to Figure 3 below for details.
FACP in top row
mounting holes
For second row
mounting, use the
MIDDLE mounting hole
For third row
mounting, use the
TOP mounting hole
Figure 3 PMB-AUX-RTO Installation
4
PMB-AUX(-RTO) Power Supplies— P/N LS10242-000GE-E:B 5/4/2022

Advertisement

loading

This manual is also suitable for:

Pmb-aux