Chapter 2: Installation And Service Checkout; Installation; Service Checkout; Mechanical Checks - GE Giraffe OmniBed Carestation CS1 Service Manual

Table of Contents

Advertisement

Chapter 2: Installation and Service Checkout

2.1 Installation

The OmniBed is shipped with the canopy in the locked down position. Before the canopy can be raised the
rail shipping locks must be released. They are located in both sides of the OmniBed near the outside bottom
of the uprights. An orange tear-away label marks their location. The lock consists of a socket head cap
screw in a slot. Tightening the screw disengages the screw head from the slot and releases the lift rail.
Using the 4 mm hex key provided with the device, turn the screw clockwise about 8 rotations until the screw
securely seats in its hole. Remove the tear away label. Perform all steps in Chapter 2 Installation and Service
Checkout including the pre-use checkout as indicated.
For units shipped with the Servo Oxygen option, the Oxygen Cells are shipped separately and must be
installed at the time of product installation. Be sure to complete the procedures in "Installing Oxygen
Sensors" on page 7-60 before performing the Servo Oxygen portions of the Service Checkout procedures in
this section of this document.
When mounted to the Carestation unit, electrically powered accessories must be plugged in using the IEC
accessory outlets provided on the back of the Carestation unit. During installation, it is necessary to remove
the plug retaining bracket. Be sure to install the plug retaining bracket as shown in "Power Cord Condition"
on page 2-2 of this document.
Warning: Do not perform the service checkout procedure while the patient occupies the device.
!
Warning: Complete the service checkout procedure section of this manual before putting the
!
device into operation. If the equipment fails any portion of the checkout procedure it must be
removed from use and repaired.

2.2 Service Checkout

Warning: The use of accessories, replacement parts, or power cords other than those specified
!
by the manufacturer may affect the performance of the device and could result in damage to
the device or unsafe operating conditions.
Warning: Insulation on electrical wiring can deteriorate with age. Check for brittle or
!
deteriorated insulation on power cord and all other electrical wiring.
Note:
All steps required to complete the pre-use checkout are included in the Service Checkout
Procedures.

2.2.1 Mechanical Checks

The following procedures verify that the device is operational and ready to be used.
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents